Thermal power station Opatovice upon Elbe - Operation optimization of HPH TG 3

Object description: Modification of control system TG 3 and operation optimization of HPH TG 3.

Used products: SandRA Z200

Branches: Automation for Conventional Power Generation, Thermal power plants

Country: Czech Republic

Realisation: 8/2015

Finished at: 2015

Text

Modification of control system TG 3 and operation optimization of HPH TG 3.

Direct/ End customer - Elektrárny Opatovice


More references