20180115 135043

Turbine turning synchronization

Turbine turning gear synchronization is designed using the SandRA Z110 system. It enables smooth, impact-free connection of the turning gear to the turbine during unit shutdown. The supported communication protocols include Ethernet, CAN, and USB.

Monitoring and visualization are provided using products from both Czech and international manufacturers. Among Czech suppliers, software applications from Geovap (Reliance) and Moravské přístroje a.s. (ControlWeb) are used. From international suppliers, applications from Aveva (InTouch) and Siemens (WinCC) are utilized.

The diagnostic system is integrated into the SandRA Z110 process stations.

Are you interested in the turbine turning gear synchronization product?

More information can be found in the attached datasheet

Synchronization

Important references

  • Kyzylorda Power Plant

    Delivery of turbine turning synchronization

    KAZ, 2024

  • Chvaletice Power Plant

    Delivery of turbine turning synchronization

    CZ, 2024

  • Plzeňská teplárenská - TGS

    Delivery of turbine turning synchronization

    CZ, 2023

  • Jafurah Cogeneration Power Plant

    Delivery of turbine turning synchronization

    SAE, 2023

  • Tanajib Cogeneration Power Plant

    Delivery of 2 turbine turning synchronization systems

    SAE, 2023

  • Temane Thermal Power Plant

    Delivery of turbine turning synchronization

    Mozambik, 2023

  • Olefin chemical plant

    Delivery of 2 turbine turning synchronization systems

    Polsko, 2023

  • Slough waste incineration plant

    Delivery of turbine turning synchronization

    Velká Británie, 2022

  • Dubai waste incineration plant

    Delivery of turbine turning synchronization

    SAE, 2021

  • Lostock waste incineration plant

    Delivery of turbine turning synchronization

    Velká Británie, 2021

  • Kemi waste incineration plant

    Delivery of turbine turning synchronization

    Finsko, 2021

  • Thermal Power Plant Morupule

    Delivery of synchronization of turbine rotating equipment

    Botswana, 2016

Want to know more? Contact us!

František Kural
František Kural

Field Guarantor
frantisek.kural@zat.cz
+420 736 519 256

LinkedIn profile